CAUTION !


Do not operate pump with closed pressure outlets - dangerous increase of temperature!

Water and foam compounds are conducting electricity! Remain a safe distance from electricity conductors!

Some materials will increase in volume and/or weight when mixed with water. Because of possibility of chemical reactions, some materials must not come in contact with water!

FAILURE TO FOLLOW THIS COULD CAUSE PERSONAL INJURY!

When the flow of water through fire hose or pipe is suddenly stopped, the resulting surge is refered to as "water hammer".

Water hammer can often be heard as a distinct, sharp clank, very much like a hammer striking a pipe. This sudden stopping results in a change in the direction of energy and this energy is instan- taneously multiplied many times. These excessive pressures can cause considerable damage to water mains, plumbing, fire hoses, and fire pumps.

Nozzle controls, hydrants, and valves should be operated slowly to prevent water hammer.



H7 Z9


R1 S10
H7 Z9


R1 S10

регулятордавлениянасоса
Регулятордавления насоса (РДН) *:

Если насос оснащен автоматическимрегуляторомдавления насоса (РДН),давление внасосе может бытьстабильнымнезависимо от количествавыпускаемойводы.

Следовательно,приведите в действие включатель (S10)и выберите необходимоедавление спуска используяпотенциометр (R1).

Скоростьнасосаповышаетсяпризаливке(еслискоростьзаливкипредварительнозапрограммирована , заливочныйнасос долженприводится в действие вручнуюиспользуярычаг (Z9). Когдапроцедуразаливкизакончена, скоростьнасоса контролируетсясерводвигателемчтобы

достичь требуемого уровня давления при изменяющихсяколичествах спуска.

Контрольная лампа (Н7) загорается,когдаРДНприводится в действие, и начинаетмигать,когда впомпе формируетсявоздушныйклапан.

В случае ошибки в работе регуляторадавления насоса,переведитевключатель (S10) в позицию ”0”. Механизмпомпы будетуправлятьсявручную, как это было описанораньше.


Pump Pressure Governor



DRE (pumppressuregovernor): *

If the pump is equipped with an automatic pump pressure governor (DRE), the pump pressure can be kept constant, independent of the amount of water discharged.

Therefore, operate switch (S10) and select required discharge pressure by using potentiometer (R1).

The pump speed is increased for priming (if priming speed is pre- programmed), the priming pump must be engaged manually by using lever (Z9). When priming procedure is finished, the pump speed is controlled by a servo motor to reach the desired pump pressure at variable discharge amounts.

The pilot lamp (H7) illuminates when DRE is engaged and starts flashing when pump is cavitating.
In case of a failure of pump pressure governor shift switch (S10) to position "0". The pump unit will be operated in manual mode as described before.





H7 S9


R1 S10

Регулятордавления насоса

РДП ( регулятордавления насоса с приложениями)*Если насос оснащен автоматическимрегулятором

давления насоса с приложениями(РДП),давление в насосеможет быть стабильнымнезависимо от количествавыпускаемойводы.

Серводвигательувеличивает скорость закачки насоса , послеактивациивключателя (S10). Заливочный насос приводится вдействие автоматически.Когдадавление в насосе достигает2 баров, заливочный насос деактивируется,тогдаработарегуляторадавленияувеличивается или уменьшается

чтобы достигнуть номинальногозначения,установленногозаранее на потенциометре (R1). Если потокводывнезапнопрерывается,заливочный насос автоматически

приводится в действие.

Контрольная лампа (Н7) начинаетмигать,когда в насосеформируетсявоздушныйклапан.

В случае ошибки электроники, скорость двигателяможетбыть снижена до холостогохода с помощьюпереключателя (S9).

Порядокосуществления действия:

Нажмите аварийныйвыключатель (S9), темвременем,переведитепереключатель (S10) в позицию ”0”.

Как раньше было описано, механизм помпы можетуправлятьсявручную

H7 S9


R1 S10

PumpPressure Governor

DRZ(pump pressuregovernorwithadditions): *

If the pump is equipped with an automatic pump pressure governor (DRZ) the pump pressure can be kept constant, independent of the amount of water discharged.

A servo motor increases to priming speed after switch (S10) is engaged. The priming pump is engaged automatically. When 2 bar pump pressure is reached, the priming pump is disengaged, then pressure governor increases or decreases to reach the nomi- nal value preadjusted at potentiometer (R1). If the water column breaks, the priming pump is engaged again automatically.

Pilot lamp (H7) starts flashing if cavitation occurs.
In case of an electronic failure, the engine speed can be decreased to idle speed by switch (S9).

Procedure:

Push emergency switch (S9), meanwhile, operate switch (S10) to position "0".

As previously described, the pump installation can be operated manually.




H10 J77

S6

H10 J77

S6

работаспенойс нД-FiXMiXрезервуараспенообразующимсоставом

  • управляйте насосом, как указано в пункте:

+ “Операция по наполнениюрезервуара”

+”Закачкаводы из открытогоисточника”

  • Снабдите напорные шланги патрубками для пены

  • Откройте клапан для закачки пены в насос

+ задействуйтепереключатель (S6)

+ загоритсяжелтаяконтрольная лампа (S10)

  • Активируйтераспределитель пены для нормальногодавления:

+ опустите рычаг (J77)

Клапанзакачки пены откроется и соответствующееколичествопенообразующегосоставасмешается спотокомводы.

+ Если механизмявляетсядвухуровневымдозаторомпены, передвиньте рычаг (J77) в нежнуюпозицию ( 3% или6%)

  • Откройте клапан(ы) спуска

  • Постепенно повысьте скорость насоса до нужногодавления.

  • Пенообразующийсоставпоступает из резервуара дляпенообразующегосоставаи формируетсмесьводы/пеныв соответствии с установленной раньше пропорциейсмеси.

Foam Operation with NP-FIX MIX from Foam Com- pound Tank *





  • Operate pump as mentioned in:

+ "Tank suction operation" or

+ "Drafting operation from open water source".

  • Provide pressure hoses with foam branch pipes.

  • Open foam compound tank suction valve:

+ Operate switch (S6).

+ Yellow pilot lamp (H10) illuminates.

  • Activate normal pressure foam proportioner:

+ Pull down lever (J77).

The foam induction valve will be opened and the correspond- ing foam compound amount is mixed to the water flow.

+ If unit is a 2-stage foam proportioner, shift lever (J77) to desired position (3% or 6%).

  • Open discharge valve(s).

  • Increase pump speed slowly to desired pressure.

  • The foam compound is thrown out of the foam compound tank and water/foam mixture according to the preadjusted admixing rate is created.





J77

J77

работаспенойснД-FiXMiXизвнешнегорезервуара для пенообразующегосостава*

  • управляйте насосом, как указано в пункте:

+ “Операция по наполнениюрезервуара”

+”Закачкаводы из открытогоисточника”

  • Снабдите напорные шланги патрубками для пены

  • присоединитенапорный шланг к насадке закачки/подачипены и поместитепротивоположный конец в резервуар спенообразующимсоставом

  • откройте клапанзакачки/подачи пены*

  • Активируйтедозатор пены для нормальногодавления:

+ опустите рычаг (J77)

Клапанзакачки пены откроется и соответствующееколичествопенообразующегосоставасмешается спотокомводы.

+ Если механизмявляетсядвухуровневымдозаторомпены, передвиньте рычаг (J77) в нежнуюпозицию ( 3% или6%)

  • Откройте клапан(ы) спуска

  • Постепенно повысьте скорость помпы до нужногодавления.

Пенообразующийсоставпоступает из внешнегорезервуара для пенообразующегосоставаи формируетсмесьводы/пены в соответствии с установленнойраньше пропорцией смеси.


Foam Operation with NP-FIX MIX with an External


FoamCompoundContainer *

  • Operate pump as mentioned in:

+ "Tank suction operation" or

+ "Drafting operation from open water source".

  • Provide pressure hoses with foam branch pipes.

  • Attach foam suction hose to the foam drafting/flushing connec- tion and put opposite end into a foam compound container.

  • Open foam drafting/flushing valve. *

  • Activate normal pressure foam proportioner:

+ Pull down lever (J77).

The foam induction valve will be opened and the correspond- ing foam compound amount is mixed to the water flow.

+ If unit is a 2-stage foam proportioner, shift lever (J77) to desired position (3% or 6%).

  • Open discharge valve(s).

  • Increase pump speed slowly to desired pressure.

  • The foam compound is thrown out of the external foam compound container and water/foam mixture according to the preadjusted admixing rate is created.



работа с пеной с ВД-FiX MiX **






H10

S6

  • Обеспечьтевысокоедавлениедляпистолетасраспылением пены

  • управляйте помпой, как указано в пункте:

+“Операция по наполнениюрезервуара”

+”Закачкаводы из открытогоисточника”
ИЗРЕЗЕРВУАРАДЛЯПЕНООБРАЗУющЕгОСОСТАВА

- Откройте клапан для закачки пены в помпу

+задействуйтепереключатель (S6)

+загоритсяжелтаяконтрольная лампа (S10)
ИЗ ВНЕШНЕгОРЕЗЕРВУАРАДЛЯ ПЕНООБРАЗУющЕгОСОСТАВА

  • присоединитенапорный шланг к насадкезакачки/подачи пены и поместитепротивоположный конец врезервуар с пенообразующимсоставом

  • откройте клапанзакачки/подачи пены*


**Факультативнаяустановка,возможнатолькоснасосамитипа НВ

Foam Operation with HP-FIX MIX **





H10

S6

  • Provide high pressure fog gun with foam extension.

  • Operate pump as mentioned in:

+ "Tank suction operation" or

+ "Drafting operation from open water source".
FROMFOAMCOMPOUNDTANK:

- Open foam compound tank suction valve:

+ Operate switch (S6).

+ Yellow pilot lamp (H10) illuminates.

FROMEXTERNALFOAMCOMPOUNDCONTAINER:

  • Attach foam suction hose to the foam drafting/flushing connection and put opposite end into a foam compound container.

  • Open foam drafting/flushing valve. *


** Optional installation, only possible with NH-pump types






J19

Работа с пеной сВД-FIX MIX **

  • АктивизируйтеВД-FIX MIX

+ Опустите селекторныйклапан (J19)Соответственносколичествомводы,будетавтоматически отмерено определенное количествопены и смешано сводой.

  • откройте клапан(ы) спуска

  • Медленноповысьтескоростьнасосадонужногодавления

-Смесьводы/пеныс3%(повыбору6%)уровнемпримесибудет выпущена в часть ВД

Важные замечания

ДляработыспенойсНД-FIXMIX,пенообразующийсоставнаходится в части насоса НД и ВД.

ДляработыспенойВД-FIXMIX,пенообразующийсоставнаходитсятолько в части насоса ВД.

Дляработыспенойизрезервуараспенообразующимсоставом,насадкадлязакачки/выпускапеныдолжнабытьоснащена слепым соединением.

Механизмнасосадолженпромыватьсякаждыйразпослеработыспеной(пожалуйста,обратитеськпункту”Промывка после работы с пеной”)

** Факультативная установка,возможнатолько снасосамитипанВ



FoamoperationwithHP-FIXMIX **



J19

  • Activate HP-FIX MIX:

+ Pull down selector valve (J19).

Corresponding to the amount of water, foam compound is proportioned automatically and mixed to the water.

  • Open discharge valve(s).

  • Increase pump speed slowly to required pressure.

  • Water/foam mixture with 3% (optionally with 6%) admixing rate is discharged at the HP-part.

Importantnotices:

For foam operation with NP-FIX MIX, foam compound is in NP-

and HP-part of pump.

For foam operation with HP-FIX MIX, foam compound is in HP- part of pump only.

For foam operation from foam compound tank, the foam drafting/ flushing connection must be provided with a blind coupling.

Thepumpsystemmustbeflushedaftereachfoamoperation(pleaserefertochapter"Flushing after foam operation").
** Optional installation, only possible with NH-pump types



1   ...   14   15   16   17   18   19   20   21   ...   39


написать администратору сайта